Inside Arrington Ice Arena Page #1(6/14/07)
Seven miles of pipes make up the grid that will freeze the ice.
A close-up of the intricate cooling system.
The grid will soon be filled with cement to create the ice surface.
Inside the arena, looking east... team benches will be on the left and fan seating on the right.
The Cimco system that maintains the ice temperature.
© Adrian College - All Rights Reserved