Arrington Ice Arena Construction Photos
Page 1
Page 2
Page 3
9-7-07
Men's Varsity Ice Hockey Locker Room
President Docking is the first to skate on the ice.
8-29-07
8-20-07
8/3/07
(7/30/07)
(7/23/07)
(7/23/07)
Some of the coaches and ice arena personnel offices. (7/18/07)
The southern end of the arena. (7/18/07)
The interior of the ice arena. (7/18/07)
The concrete surface has been completed.
The view from the fan-seating side of the arena, looking toward the team benches.
The future site of fan seating
Looking into the coaches' office area
The concrete pour (6/21/07)
Arrington Construction pics 2
Arrington Construction pics 1
© Adrian College - All Rights Reserved