The Stadium Project

Adrian College is building a multisport performance stadium, in addition to a separate track and field facility. Here are archived photos of the project. Also, see more recent photos or older photos (before late April).


(8/2)


(7/31) The lights are in place.


(7/31) The pavilion location.


(7/31) Press box work continues.


(7/26) The press box takes shape.


The flag poles are laid out around the scoreboard (7/26)


The frame for the scoreboard in the southwest corner (7/19)


(7/19)


The plumbing and electrical work can be seen in the training room (7/19).


Another light pole goes infront of the nearly complete visitors' concessions stand (7/17).


The light pole in the Northeast corner (7/17).


The south endzone has been enclosed and the land for the pavilion has been leveled (7/17).


The press box construction continues (7/10).


The visitors' concession stand and restroom facility. (7/7)


Work continues on the press boxes. (7/7)



The athletic training room, looking into the hydro room. (7/7)


The turf crew "fiberates" the turf. (7/5)


The rubber and sand mixture before being mechanically brushed into the turf. (7/5)



The sidewalk behind the visitors' bleachers (7/5)



(6/30) The home men's restroom.


(6/30)


(6/30) The lights for the southeast corner of the stadium


(6/27)


The Bulldog Paw Print is in place at midfield with the visitors' seating in the background. (6/27)


Quite a production line is involved in laying the cement floor of the visitors' restroom/concessions. (6/27)


The shell of the home women's restroom is nearing completion. (6/27)


Laying the top of the wall on the home sideline (6/27)


(6/22)


(6/22)


(6/22)


(6/22)


(6/22)


The rubber that will be part of the surface (6/22)


(6/22)

Laying down the numbers... step-by-step (6-20)







The first light pole is in place. (6/20).

 


(6/19)


(6/19)


(6/19)


(6/19)


(6/19)



(6/19)


(6/19)


The endzone lettering (6/19)


(6/19)


The home locker room is taking shape. (6/19)


The new weight room is now in place with a full selection of Hammer Strength equipment. (6/19)


(6/14)


(6/14)


(6/14)


(6/14)


(6/14)


(6/13) -Courtesy Mike Mills


This will be the view from some of the reserved season tickets (info. coming soon) (6/13)


This "sewing machine" links the strips of turf. (6/13)


(6/13)


The "Tunnel" (6/13)


Building the concessions stand (6/13)


The first strip of turf hit the field today around 9:00 a.m. (6/13)


(6/13)


Unrolling the first strip. The white line is the 50 yard line. (6/13)


Matching innovation with tradition, the new stadium brick-work matches the Merillat Center (6/12)


The stadium entrance nears completion (6/12)


The base for the field is now in place and nearly ready for the turf. (6/8)


(6/8)


The view from atop the Merillat Center. (6/8)


(6/8)


Restroom plumbing installation. (6/8)


One roll of the recently delivered turf (6/7)


The future Bulldog playing surface. (6/7)


One ticket booth (6/7)


Continuing field work along the visitors' sideline (6/7)


Four layers of drainage are visable on this day. (6/7)


Skilled craftsmen construct the facade. (6/7)


The field is prepared for turf installation. (6/5/06)


(6/5/06)


(6/5/06)


The site of the pressbox. (6/5/06)


The visitors bleachers take shape. (6/5/06)


The visitors' restroom facility. (6/5/06)


(4/12/06)


(4/12/06)


(4/17/06)


(4/17/06)


(4/25/06)


(4/25/06)


(4/25/06)


Work continues on the "Back 40," near the softball field and new track site. (4/25/06)


Aerial view of the "Back 40;" US-223 cuts across the middle, and the stadium site is off the frame to the left. (4/15/06, courtesy of Robert Wissolik)