Changes in Dining: The plan more

Dining Hall Photos:
Current
Archive

Dining Hall Construction updated 8/28/06

In Stages...check out the progress of different areas of the new Ritchie Marketplace.

On the day after graduation (May 1), workers fenced off Ritchie Dining Hall to begin a series of exciting renovations that will transform the facility into Ritchie Marketplace. The work is scheduled for completion by the time students arrive for fall semester.

New Main Entrance

Ritchie Marketplace Interior

President's Dining Room

New Outdoor Patio

Double sided Fireplace


5/2/2006 The former Ritchie Dining Hall

New Main Entrance


5/30/06 Begin with the foundation.


6/2/06

6/26/06 Steel beams placed

6/27/2006

6/27/06 Entrance Peaked Roof

7/6/2006

7/7/06

7/13/2006

7/18/06 New Entrance

7/21/06 One of the sidewalks leading to the new entrance.

7/26/06 Front Entrance


7/27/06


8/3/06

8/4/06 The new entrance between Ritchie and the AT Room

8/10/06

8/17/06 Ceiling tiles are placed in the new entrance.

Ritchie Marketplace Interior top


5/25/06 Interior

6/15/06

6/15/06 New Windows

6/20/06

6/20/06

7/14/06 Pizza Oven

7/6/06 Interior

7/6/06 Interior

7/14/06 Trim being sanded and stained

7/17/06 Half of the interior is painted.

7/18/06 Interior lights


7/18/06 Interior lights


7/21/06 Floor

7/24/06

7/24/06


7/24/06


7/26/06 Floors

7/26/06 Work continues on pizzaoven.

7/27/06

7/27/06

7/31/06

7/31/06
7/31/06

7/31/06


8/2/06

8/2/06

8/4/06

8/7/06

8/8/06


8/10/06


8/14/06

8/14/06

8/17/06 Carpet

8/17/06 Carpet

8/18/06

8/18/06

8/24/06 New seats

8/24/06

8/25/06

8/25/06

8/25/06

8/25/06

8/25/06

8/25/06

8/28/06

8/28/06

8/28/06

8/28/06


President's Dining Roomtop


6/8/06

7/6/06 Inside the President's Dining Room

7/6/06 Outside the President's Dining Room

7/14/06 New Bay Window

7/19/06 Bay Window

7/27/06 Painting

7/27/06

8/2/06 New woodwork on walls.

8/2/06

8/3/06 Entrance from Ritchie Marketplace to the
President's Dining Room

8/10/06

8/10/06

New Outdoor Patio top


6/26/06 Pillars to mark the patio

6/27/06 Brickwork around the pillars

7/10/06 Patio Pillars

7/21/06 Cement is being poured for the patio

7/24/06

7/24/06

7/25/06

8/1/06

8/1/06

8/2/06

8/4/06

8/7/06

8/8/06 The former entrance to Ritchie will now be the way students enter/exit the outdoor patio.

8/22/06

8/22/06

8/22/06

Double sided Fireplace top


5/30/06 Former fireplace

6/14/06

6/26/06 Double sided fireplace installed

7/10/06


7/14/06


7/27/06 Double-sided fireplace

8/2/06 New tile

8/4/06

8/8/06

8/17/06

Back to top